Methods of Design and Construction
The St. -::·ranc is Dam was bui 1 t by the Department of
Water Works and Supply of the City of Los Angeles , by the
City's own forces and not by contract"
The design of the dam and the foundation conditions
were not passed upon by independent engineers and geologists.
The exploration work and testing of foundation
materials prior to reaching a decision to build a dam at this
site, were entirely inadequate to definitely determine the
true qualities of the bedrock and the proper type of dam to
build at the site.
The exploration work, both before and during construction,
was practically limited to the boundaries of the concrete
structure and did not adequately reveal the topography and
character of the bedrock structure beyond these boundaries.
The inspection of the work during construction was very
limited and defective in principle owing to the fact that the
inspections were made by the same peopie who were directing
or doing the work, without adequate check inspection by an
independent personnel to reduce the effect of personal error.
Extensive exploration work, inspection and testing of
materials and consultations with experts unquestionably would
have revealed the true character of the site and prevented
this calamity