Page 10 - northlakehills_deir_0517
P. 10

NorthLake Specific Plan
                                                                                            Draft Supplemental EIR

                                                          TABLES
               Table                                                                                    Page

               5.8-6    Water Quality Monitoring Data for Metals at the Castaic Lake Outlet Tower .......... 5.8-17
               5.8-7    2010 CWA Section 303(d) Listings for the Santa Clara River Mainstem ................ 5.8-22
               5.8-8    TMDL Wasteload Allocations for MS4 and Stormwater Sources to Santa
                        Clara River Reach 5 .............................................................................................. 5.8-23
               5.8-9    Modeled Project Drainage Areas and LID BMPs .................................................... 5.8-43
               5.8-10   Predicted Average Annual Stormwater Runoff Volumes ........................................ 5.8-50
               5.8-11   Predicted Average Annual TSS Concentration and Load in Project Runoff ........... 5.8-51
               5.8-12   Comparison of Predicted TSS Concentrations with Water Quality Criteria and
                        Observed Concentrations in Castaic Lagoon ......................................................... 5.8-51
               5.8-13   Predicted Average Annual Total Phosphorus Concentration and Annual Load
                        in Project Runoff ..................................................................................................... 5.8-52
               5.8-14   Predicted Average Annual Nitrate + Nitrite Concentration and Load in Project
                        Runoff ..................................................................................................................... 5.8-52
               5.8-15   Predicted Average Annual Ammonia-N Concentration and Load in Project
                        Runoff ..................................................................................................................... 5.8-52
               5.8-16   Predicted Average Annual Total Nitrogen-N Concentration and Load in Project
                        Runoff ..................................................................................................................... 5.8-53
               5.8-17   Comparison of Predicted Total Phosphorus and Nitrogen Compound
                        Concentrations with Water Quality Criteria and Observed Concentrations in
                        Castaic Lagoon ....................................................................................................... 5.8-54
               5.8-18   Predicted Change in Average Concentration of Nutrients in Castaic Lagoon
                        with Project Runoff .................................................................................................. 5.8-55
               5.8-19   Predicted Average Annual Dissolved Copper Concentration and Load ................. 5.8-57
               5.8-20   Predicted Average Annual Total Copper Concentration and Load ......................... 5.8-57
               5.8-21   Predicted Average Total Lead Concentration and Annual Load ............................. 5.8-57
               5.8-22   Predicted Average Annual Dissolved Zinc Concentration and Load ...................... 5.8-57
               5.8-23   Predicted Average Annual Total Zinc Concentration and Load .............................. 5.8-58
               5.8-24   Predicted Average Total Iron Concentration and Annual Load ............................... 5.8-58
               5.8-25   Comparison of Predicted Trace Metal Concentrations with Water Quality
                        Criteria and Observed Concentrations in Castaic Lagoon ...................................... 5.8-59
               5.8-26   Predicted Average Annual Chloride Concentration and Load ................................ 5.8-60
               5.8-27   Comparison of Predicted Chloride Concentrations with Water Quality Criteria
                        and Observed Concentrations in Castaic Lagoon .................................................. 5.8-60
               5.8-28   E. Coli. TMDL Implementation Schedule for Santa Clara River ............................. 5.8-63
               5.8-29   Post-Grading Hydrology for Specific Plan ............................................................... 5.8-76
               5.9-1    SCAG RTP/SCS Consistency Analysis .................................................................. 5.9-13
               5.9-2    County General Plan Consistency .......................................................................... 5.9-15
               5.9-3    Santa Clarita Valley Area Plan 2012 Consistency .................................................. 5.9-32
               5.9-4    Adopted Specific Plan Goals and Policies .............................................................. 5.9-55
               5.10-1   Noise Levels for Common Activities ....................................................................... 5.10-2
               5.10-2   Existing Measured Noise Levels ............................................................................. 5.10-8
               5.10-3   Existing Noise Levels .............................................................................................. 5.10-9
               5.10-4   California Land Use Compatibility Guidelines ....................................................... 5.10-10
               5.10-5   County of Los Angeles Construction Equipment Noise Limits .............................. 5.10-13
               5.10-6   County of Los Angeles Exterior Noise Standards ................................................. 5.10-14
               5.10-7   Residential Air Conditioning and Refrigeration Equipment Noise Limits .............. 5.10-15
               5.10-8   Typical Maximum Construction Noise Levels ....................................................... 5.10-19
               5.10-9   Estimated On-Site Traffic Noise Levels ................................................................ 5.10-22
               5.10-10  Vibration Damage Threshold Criteria .................................................................... 5.10-25
               5.10-11  Vibration Levels for Construction Equipment ........................................................ 5.10-26

               R:\Projects\OC\WCP_Woodrid\J0001\Draft EIR\!TOC-042617.docx   viii               Table of Contents
   5   6   7   8   9   10   11   12   13   14   15