Page 91 - city_otnsp_122205
P. 91

CHAPTER 3 : IMPLEMENTATION


              PHASING STRA TEGY: PHASE  3A        2 0 2 0 - 2 2


        CIVIC	BUILDINGS	AND	INITIATIVES	(CIV)

        Purpose	-	To	generate	a	civic	realm	to	enhance	the	commercial	and	residential	components	of	Old	Town	Newhall

        CIV-8		Billboard	Abatement

        As it relates to aesthetics, the issue of removing billboards is as important to Old Town Newhall as is the relocation of existing
        utilities below ground.  To this end, a similar program is to be established for the Specific Plan area.  The details of the program
        are to be developed and tailored to the City’s ability to pursue the abatement of these structures.  At a minimum, such a
        program needs to: a)provide a clear purpose and intent for the removal of billboards (including what is considered to be a
        billboard), b)identify all billboards within the Specific Plan area that will be subject to the program, and c)provide a financial
        rationale and method for pursuing and achieving the removal of billboards.

        $500,000

        CIV-3	 Civic	Building	at	Lyon’s	and	Main

        Purpose	-	To	provide	a	community	/	civic	anchor	visually	and
        socially	in	Downtown

        The current library located at Walnut and 9th Streets is small
        by today’s standards.  At approximately 3,000 square feet,
        it is operated by Los Angeles County and is used well by
        the Newhall community.  The proposed building represents
        approximately 30,000 square feet of floor space which is
        mostly library.  The idea is to substantially enhance current
        library service and position the new library in such a way that
        it announces to Newhall and the greater community of Santa
        Clarita the civic importance of the revitalized downtown area.
        Such an institution would also provide more reasons for people
        to visit Old Town Newhall and its varied stores, services and   A: Civic Building at Lyon’s Avenue and Main Street
        attractions.  It is possible that this project could include other
        tenants (private or public) to help the financing of the project, if
        needed.  This project is identified in phase 3 only due to funding
        demands on the overall implementation plan.  If the opportunity
        to implement this project occurs prior to this phase, the project
        should be pursued.

        As with all civic buildings designated throughout the Specific
        Plan area, it is not the responsibility or only option for the
        owners of these properties.  Rather, due to the designated site’s
        strategic location in the overall Plan area, such sites are better        AVE       AVE       A         AVE
        suited for civic buildings and uses than others.  Therefore, in
        addition to the underlying zoning on these properties, these                LYONS         AVENUE
        sites are enhanced with the designation for such buildings if the
        desire to implement these projects presents itself. UPDATE: The   NEWHALL  AVE
        project is complete.                                                      CHESTNUT  WALNUT     MAIN   ST  RAILROAD

        $25,000,000



        103   O LD  T OW N  N E W H A L L   S PE CIF I C  P LA N
              City of Santa Clarita, California
              ADO P T ED   D E C E m b E r  2 2,   2 0 05
              rE V IS ED:   m A r C H  2 8 ,   2 017
   86   87   88   89   90   91   92   93   94   95   96