Santa Clarita Valley History In Pictures
> CASTAIC LAKE WATER AGENCY

Recycled Water Program, Phase 2A.
Central Park Recycled Water Main Extension.


Background and Project Description: The Draft Recycled Water Master Plan (Draft RWMP) sets forth a plan to expand the recycled water system in the Santa Clarita Valley to offset potable water demands. The existing recycled water system is referred to as Phase 1 and provides approximately 450 acre-feet per year (afy) of recycled water to golf courses and median landscapes. Phase 2 includes four separate phases (2A, 2B, 2C and 2D) that will expand the recycled water system to the east, west and south portions of the Santa Clarita Valley. The Central Park Recycled Water Main Extension (Phase 2A) Project will provide recycled water to the service areas of Santa Clarita Water Division (SCWD) and Valencia Water Company (VWC) by using recycled water from the Valencia Water Reclamation Plant (WRP). It is estimated that up to 560 afy would be available to SCWD and VWC to serve nearby existing irrigation customers along the pipeline alignment.

As proposed, up to a 24-inch transmission pipeline would originate at the Valencia WRP at The Old Road and extend for approximately 5.25 miles, or up to 33,000 linear feet, along Rye Canyon Road and Newhall Ranch Road. At the Newhall Ranch Road and Bouquet Canyon intersection, the proposed Project will continue in one of two directions to Central Park. The first alternate alignment would be north along Bouquet Canyon Road, while the second alternate direction would be east along Newhall Ranch Road to the River Village development and then north to Central Park. This pipeline would serve industrial and non-potable irrigation demands adjacent to the alignment. Anchor irrigation customers would be Valencia High School, Valencia Heritage Park, Bridgeport Park and Central Park.


Download original pdf here.
CASTAIC DAM & RESERVOIR; CLWA
("Castaic Lake")

thumbnail

History of Santa Clarita Water Co./Division

thumbnail

Dissolution of Santa Clarita Water Co.
10-25-2017

thumbnail

Construction Starts 1966

thumbnail

Construction 1967-70 x10

thumbnail

Towner Mfg. Constrution Report 1969

thumbnail

Castaic Lake: 50-Year Operating Agreement 1969

thumbnail

Aerial 12/5/1970

thumbnail

Boat Launch 1972

thumbnail

Dorn at Afterbay Opening 5/22/1972

thumbnail

Dorn-Haddad 5/22/1972

thumbnail

Main Lake Opens 6/26/1972

thumbnail

CLWA Facility 1980

thumbnail

"Dinocroc" 2004

thumbnail

Huell Howser:
Groundwater Banking 2008

thumbnail

Drought 2015

thumbnail

Recycled Water Main Extension, Central Park, 12/13/2017


thumbnail

Aqueduct Ruptures in AV, 1971

RETURN TO TOP ]   RETURN TO MAIN INDEX ]   PHOTO CREDITS ]   BIBLIOGRAPHY ]   BOOKS FOR SALE ]
SCVHistory.com is another service of SCVTV, a 501c3 Nonprofit • Site contents ©SCVTV
The site owner makes no assertions as to ownership of any original copyrights to digitized images. However, these images are intended for Personal or Research use only. Any other kind of use, including but not limited to commercial or scholarly publication in any medium or format, public exhibition, or use online or in a web site, may be subject to additional restrictions including but not limited to the copyrights held by parties other than the site owner. USERS ARE SOLELY RESPONSIBLE for determining the existence of such rights and for obtaining any permissions and/or paying associated fees necessary for the proposed use.
comments powered by Disqus