Page 1887 - trc_centennial_deir201705
P. 1887

5.20 Dry Utilities

                           o  Project Design Features
                           o  Threshold Criteria
                           o  Environmental  Impacts—A  separate  analysis  is  provided  for  each  of  the
                              following categories of potential impacts:
                                    On-Site Impacts
                                    Off-Site Impacts
                           o  Mitigation Measures
                           o  Level of Significance After Mitigation
                   •  Telephone Service
                           o  Relevant Plans, Policies, and Regulations
                           o  Environmental Setting
                           o  Project Design Features
                           o  Threshold Criteria
                           o  Environmental  Impacts—A  separate  analysis  is  provided  for  each  of  the
                              following categories of potential impacts:
                                    On-Site Impacts
                                    Off-Site Impacts
                           o  Mitigation Measures
                           o  Level of Significance After Mitigation

                   •  Cable Television
                           o  Relevant Plans, Policies, and Regulations
                           o  Environmental Setting
                           o  Project Design Features
                           o  Threshold Criteria
                           o  Environmental  Impacts—A  separate  analysis  is  provided  for  each  of  the
                              following categories of potential impacts:
                                    On-Site Impacts
                                    Off-Site Impacts
                           o  Mitigation Measures
                           o  Level of Significance After Mitigation

                    •  References

               References


               Although all references cited for preparation of this analysis are listed in Section 5.20.6, the
               primary technical references for this section are listed below.


                   1.  BJ  Palmer  &  Associates,  Inc.  2015  (August).  Dry Utility Analysis Centennial, Tejon
                       Ranch Company San Juan Capistrano, CA: BJ Palmer (Appendix 5.20-A).













               R:\Projects\PAS\CEN\000306\Draft EIR\5.20 Dry Utilities-051117.docx   5.20-3   Centennial Project
                                                                                                     Draft EIR
   1882   1883   1884   1885   1886   1887   1888   1889   1890   1891   1892