Page 1387 - trc_centennial_deir201705
P. 1387

5.10  Traffic, Access, and Circulation
                    RAMP PEAK HOUR VOLUMES AND V/C SUMMARY –CUMULATIVE (2035 AND 2040) CONDITIONS
                         SOUTHBOUND/WESTBOUND
                 TABLE 5.10-27

                            PM Peak Hour  PM Peak Hour  AM Peak Hour  Project   Impact?   V/C   Vol   V/C   Vol   Cap  Lanes   ADT  LOCATION   V/C   Vol  San Fernando Rd                                         SB On-Ramp      0.60    900   0.56    840   1,500   1  11,500   Existing   0.53    800       0.41    620   0.58    870   1500   1  8,500   2035 No Project    0.86  1,290       0.41    610   0.58    870   1,500   1  8,200   2035 With Project   0.85   1,270   Project Traffic &















                            AM Peak Hour   V/C   Vol           0.49    740    0.50    750    0.50    750    0.00    0





                         NORTHBOUND/EASTBOUND









                               Cap       1,500   1500   1,500






                               Lanes       1   1   1      * Connector ramps with no auxiliary lane at freeway mainline   See Table 5.10-11 for ramp performance criteria (Table 1-5 of Traffic Study).   Boldface type denotes an intersection that exceeds performance threshold.








                               ADT       10,200    9,100    8,900    (200)                                       R:\Projects\PAS\CEN\000306\Draft EIR\5.10 Traffic-051217.docx






                                  NB

                                  Rd                          Source: Stantec 2017 (Table 4-7).




                               LOCATION   San   Off-Ramp   Existing


                                  Fernando   2035 No Project  2035 With Project  Project Traffic & V/C   Jct: junction
   1382   1383   1384   1385   1386   1387   1388   1389   1390   1391   1392