Page 1814 - skylineranchfeiraddendum1216
P. 1814

12  13  14     33  34  15            30                    31
                                                          11                                                           790             March 2016



                                     Seimic load  Horizontal:  0.15  Vertical: 0.0  37  TQs 100-25° (A-Bed 0-5°)   Shear Layer TQs 100-25° (A-Bed 0-5°)   Section 20-20  740  690  640  590  153035-01 Project No:   BAS  Engineer:  Date:










                              Section 20-20 Seismic Final SSA with key for Skyline Ranch.gsz  Run By: Dr. Alexander Bykovtsev, Ph.D., P.E.  3/24/2016   2:11:22 PM



                          Section 20-20 Seismic Final SSA with key for Skyline Ranch.gsz

                                                  Keyway depth 15' width 30', backcut slope 3H:1V   10  9  8  7  Fill  540  490



                                            1.27                    6  5  41  40  39                                   440



                                                                     4


                                                                            38  36  35             Tmc 100-25° (A-Bed (-3°)-(-18°)   390
                                                                           3 TQs 100-25° (A-Bed 0-5°)
                                                                     B65   2                                           340  Distance (ft)  Development project, Tract 60922

                                                                             1  28 29                                  290                   Skyline Ranch              Los Angeles CA  A-1245
                                            Tmc 100-25° (A-Bed (-3°)-(-18°)  TQs 100-25° (A-Bed 0-5°)   267  2         240  190
                                                                     (95)
                                                                    B6











                                    Materials  Shear Layer  Fill           Phi-Anisotropic Strength Fn.: Tmc 100-25° (A-Bed (-3°)-(-18°)   C-Anisotropic Strength Fn.: 100psf-25° (A-Bed (-3°)-(-18°)    25  24  23  22 Phi-Anisotropic Strength Fn.: TQs 100-25° (A-Bed 0-5°)   140  90  40  28532 Constellation Road, Valencia, CA 91355












                                   Name: Shear Layer  Model: Mohr-Coulomb   Unit Weight: 120 pcf  Cohesion': 150 psf  Name: Fill   Model: Mohr-Coulomb   Unit Weight: 120 pcf  Cohesion': 200 psf  Name: Tmc 100-25° (A-Bed (-3°)-(-18°)   Model: Anisotropic Fn.   Unit Weight: 120 pcf  Cohesion': 200 psf  Name: TQs 100-25° (A-Bed 0-5°)   Model: Anisotropic Fn.   Unit Weight: 120 pcf  Cohesion': 225 psf  21  20 C-Anisotropic Strength Fn.: 100 psf (A-Bed0°-5°)    19  18  -10  -60  LGC Valley, Inc GEOTECHNICAL CONSULTING  Phone 661-702-8474, Fax 661-702-8475




                                                                                           Phi': 40 °
                                            Phi': 11 °
                                                          Phi': 33 °
                                                                        Phi': 40 °
                                                                                                        17             -110

                                                                                                                       -160
                                                                                                                   32
                                                                                                        16
                                                         1,900   1,850  1,800   1,750  1,700  Elevation (ft)  1,650  1,600  1,550  1,500
   1809   1810   1811   1812   1813   1814   1815   1816   1817   1818   1819