               Alternative 1. As such the Alternative 2 alignment would minimize railroad crossing events and would
               therefore be environmentally superior to the proposed Project.

                       (d)    Environmental Review Process


               The  Draft  EIR  will  be  circulated  for  review  and  comment  by  the  public  and  other  interested  parties,
               agencies, and organizations for a period of 60 days.  After completion of the 60 day review period, a Final
               EIR will be prepared that responds to comments on the Draft EIR submitted during the review period and
               modifies the Draft EIR as required.  Public hearings on the proposed Project will be held after completion
               of  the  Final  EIR.    The  City  will  make  the  Final  EIR  available  to  agencies  and  the  public  prior  to
               considering certification of the Final EIR.  Notice of the time and location will be published prior to the
               public hearing date.  All comments or questions about the Draft EIR should be addressed to:


                   City of Santa Clarita
                   Carla Callahan, Senior Engineer
                   23920 Valencia Boulevard, Suite 300
                   Santa Clarita, CA 91355
                   Fax: (661) 286-4130
                   Email: ccallahan@santa-clarita.com



                       (e)    Organization of the Draft EIR

               The Draft EIR is organized into eight sections as follows:

               Section  1  (Executive  Summary):    This  section  provides  an  introduction  to  the  environmental  review
               process  and  a  summary  of  the  proposed  Project  description,  alternatives,  environmental  impacts,  and
               mitigation measures.


               Section  2  (Project  Description):    A  complete  description  of  the  proposed  Project  including  Project
               location, Project Site characteristics, Project characteristics, Project objectives, and required discretionary
               actions is presented.


               Section 3 (Environmental Setting):  An overview of the environmental setting of the proposed Project is
               provided including a description of existing and surrounding land uses, and a list of related projects.


               Section 4 (Environmental Impact Analysis):  The Environmental Impact Analysis section is the primary
               focus of this Draft EIR.  Separate discussions are provided to address the potential environmental effects
               of  the  proposed  Project.    Each  environmental  issue  contains  a  discussion  of  existing  conditions,  an
               assessment and discussion of the significance of impacts associated with the proposed Project, mitigation
               measures, cumulative impacts, and level of impact significance after mitigation.

               Section 5 (General Impact Categories):  This section provides a summary of significant and unavoidable
               impacts  of  the  proposed  Project,  a  summary  of  the  impacts  determined  to  be  less  than  significant,  a


               Lyons Avenue/Dockweiler Drive Extension Project                             1. Executive Summary
               SCH No. 2013082016                                                                     Page 1-5