Page 13 - bermite120204.htm
P. 13

Contents, Continued








                   Tables—Tables are located at the end of each section.
                   1-1    Historical Pumping at Impacted Saugus Formation Production Wells

                   2-1    Recharge and Discharge Components of the Hydrologic Cycle in the Upper Santa
                          Clara River Basin

                   2-2    Historical Hydrology in Northern California and the Santa Clarita Valley, 1950
                          through 2003
                   2-3    Annual Pumping Rates Specified by the Operational Plan for the Santa Clarita
                          Valley’s Groundwater Resources
                   2-4    CALSIM II Calculated State Water Project Municipal and Industrial Allocations

                   2-5    State Water Project Allocations and Corresponding Saugus Formation Pumping for
                          the 78-year Simulation

                   2-6    Simulated Annual Groundwater Pumping from the Saugus Formation
                   2-7    Allocation of Pumping by Layer for Wells Completed in the Saugus Formation

                   2-8    Allocation of Pumping by Month for Agricultural and Urban Production Wells
                   2-9    Local Hydrology and Corresponding Pumping from the Alluvial Aquifer for the
                          78-year Simulation
                   2-10   Recent and Simulated Future Annual Groundwater Pumping Volumes from the
                          Alluvial Aquifer

                   2-11   Simulated Monthly Precipitation at the Newhall County Water District Rain Gage
                   2-12   Simulated Monthly Streamflows in the Santa Clara River at the Lang Gage
                   2-13   Simulated Monthly Water Releases from Castaic Lagoon to Castaic Creek

                   2-14   Water Demands and Indoor Water Use under Full Build-out Conditions
                          (Excluding Newhall Ranch)
                   2-15   Treated Water Discharges from the Saugus and Valencia WRPs to the Santa Clara
                          River under Full Build-out Conditions
                   2-16   Simulated Monthly Treated Wastewater Discharge from Santa Clarita Valley WRPs
                          under Full Build-out Conditions
                   2-17   Simulated Annual Groundwater Budget

                   3-1    Well Network for Sentinel Groundwater Quality Monitoring
                   3-2    Chemical Constituents and Sampling Frequency for 97-005 Sentinel Monitoring
                          Program






                   IV                                                                       RDD/041620011 (CLR2739.DOC)
   8   9   10   11   12   13   14   15   16   17   18